This image of the US 59 project, photographed by VRX Senior Inspector Mike Van Winkle in July 2020, shows straps that were attached to panel walls prior to CSS being placed on top. This work holds in panels in place so the next row can be set.
VRX, Inc. is providing prime construction management services for US 59 in Cleveland, Texas, for the TxDOT Beaumont District.
Our work on the US 59 project, with an approximate $102M construction value, began in May 2019. The project limits extend 4.6 miles from the south end of the Cleveland Bypass to Fostoria Road. US 59 is being converted to a freeway facility and widened to 6 main lanes with frontage roads. Construction work also includes full-depth repair, overlay, spall repair, striping, and illumination upgrades.
VRX is the prime Construction Engineering and Inspection (CEI) consultant. Our work includes ensuring construction is performed per plans and specifications; reviewing shop drawings and submittals; handling contractor’s claims; assessing the need for change orders; negotiating and preparing change orders as needed; reviewing construction schedules; preparing as-built plans; handling utility conflicts, and coordinating with TxDOT and utility owners; coordinating with area communities and TxDOT to inform the public about upcoming traffic switches and lane closures; and maintaining project records, among other responsibilities. VRX is also performing comprehensive environmental compliance services.