Prior to the City of Fort Worth Street Maintenance Program, this project consisted of the rehabilitation of a water distribution main on College Avenue in the densely populated Rosemont area of Fort Worth. The existing system was undersized for the current water demands and deteriorating. The rehabilitation design specified the replacement of approximately 1,650 linear feet of 8-inch PVC pipe. Existing meters and meter boxes were upgraded and new service laterals were detailed to serve each residential lot.